PRISMA 2020 Compliance
EvidAI ensures 100% compliance with the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) 2020 guidelines.
What is PRISMA?
PRISMA provides:
- Evidence-based reporting guidelines
- 27-item checklist for systematic reviews
- Flow diagram standard
- Transparent methodology requirements
Automatic Compliance
Checklist Coverage
EvidAI automatically addresses all 27 items:
Title (Item 1)
- ✅ Identifies report as systematic review
Abstract (Items 2)
- ✅ Structured abstract with all elements
Introduction (Items 3-4)
- ✅ Rationale and objectives documented
Methods (Items 5-16)
- ✅ Protocol and registration
- ✅ Eligibility criteria
- ✅ Information sources
- ✅ Search strategy
- ✅ Selection process
- ✅ Data collection
- ✅ Data items
- ✅ Risk of bias assessment
- ✅ Effect measures
- ✅ Synthesis methods
- ✅ Reporting bias assessment
- ✅ Certainty assessment
Results (Items 17-23)
- ✅ Study selection (flow diagram)
- ✅ Study characteristics
- ✅ Risk of bias in studies
- ✅ Results of individual studies
- ✅ Results of syntheses
- ✅ Reporting biases
- ✅ Certainty of evidence
Discussion (Items 24-26)
- ✅ Discussion sections
- ✅ Conclusions
Other (Item 27)
- ✅ Registration and protocol
- ✅ Support and funding
- ✅ Competing interests
- ✅ Data availability
PRISMA Flow Diagram
Automatic Generation
EvidAI creates publication-ready flow diagrams:
- Records identified from each database
- Duplicates removed
- Records screened
- Reports excluded (with reasons)
- Studies included in review
- Studies in meta-analysis
Customization Options
- Add/edit box contents
- Include additional stages
- Customize labels
- Export in multiple formats
Export Formats
- SVG (scalable vector)
- PNG (high resolution)
- PDF (print quality)
- Editable format
Compliance Tracking
Real-Time Status
Dashboard shows:
- Items completed
- Items in progress
- Items requiring attention
- Overall compliance percentage
Completion Guidance
For incomplete items:
- What's needed
- Where to find information
- How to complete
Checklist Export
For Submission
Generate completed checklist:
- All 27 items addressed
- Page/section references
- Compliance evidence
Formats
- Word document
- HTML
- Markdown
Best Practices
During Review
- Address items as you complete phases
- Use checklist as quality guide
- Don't leave items for the end
Before Submission
- Review all 27 items
- Verify page references
- Ensure flow diagram accuracy
- Export final checklist